Hot Work Permit
Permit Issued By:
Email Address:
Phone Number
Permit Issued To:
Date of Work:
2005
2006
2007
2008
-
1
2
3
4
5
6
7
8
9
10
11
12
-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Location of Work:
Time Work to be Started:
01
02
03
04
05
06
07
08
09
10
11
12
:
00
15
30
45
AM
PM
Time Work to be Finished:
01
02
03
04
05
06
07
08
09
10
11
12
:
00
15
30
45
AM
PM
Nature of Work:
Comments
Required:
If you cannot check each of the following boxes, please contact Risk Management before beginning hot work.
1.
You have reviewed the
Hot Work Decision Tree
, and there is no
acceptable alternative
to hot work.
2.
Flammable liquids and combustibles within 35 feet of the
hot work
have been removed, or non-combustible shields/covers are provided?
3.
Floor and wall openings, if present, are covered and protected.
4.
Tools and equipment are in safe working condition, with guards and safety devices in place.
5.
The
correct type and size of fire extiguisher
is at the hot work site.
6.
Fire sprinkler protection
, if installed, is operational.
7.
You have reviewed the
"Fire Watch Decision Tree"
, and determined if a fire watch person is required.
If required, the person acting as fire watch must:
a. Be present during the hot work operation.
b. Remain at the hot work site for 1 hour after the hot work is completed.
c. Arrange for the site to be monitored by a
responsible individual
for an additional 3 hours.
Fire Watch:
Monitor:
- file a copy of this permit with Risk Management.
Note - If you cannot submit this permit electronically, please call Risk Managment at 422-4468, and provide the information requested above.